- Azot bypass system -
Obxod

BRIEF SYSTEM DESCRIPTION

The user plans the bypass routes created at the previous stage for a specified period using the standard TRIM (ESO) planning mechanism, with the frequency defined at the bypass formation stage. Additionally, it is possible to manually change the date and time of already scheduled bypasses on the bypass schedule.

Main ESO Processes:

  • Formation of bypasses;
  • Bypass planning;
  • Assignment of bypass;
  • Bypass execution;
  • Registration of bypass results;
  • Registration of defects and deviations;
  • Obtaining and analyzing bypass results;
  • Analysis and control.

After completing the bypass, the mobile device checks the full completion of all checks belonging to this bypass, and the presence of the "Completed" status for each object included in the bypass. If this bypass is fully completed by the user, the system automatically closes the bypass and sets the status to "Completed".